|
||||||
Ho-Chunk Casino InfrastructurePlanning & Community Development Comprehensive Planning Neighborhood Planning Urban Redevelopment Planning Outdoor Recreation Planning Public Facilitation Impact Fee Planning Developer Representation Economic Development Business/Industrial Parks Tax Increment Financing (TIF) Market Analysis Strategic Planning Fiscal and Economic Impact Analysis Grant Writing / Administration Business Recruitment Urban Design & Landscape Architecture Concept Planning Illustrations & Renderings Park & Plaza Design Landscaping Plans Streetscape Bike & Pedestrian Trails Municipal & Civil Engineering Municipal Infrastructure Design & Studies Streets and Roadways Site Development Stormwater Systems Water Supply & Distribution Systems Wastewater Treatment & Collection Systems Construction Observation & Administration Surveying & GIS CSMs, Boundary Surveys and Legal Descriptions Platting: Subdivision/Condominium/Assessor’s/ Right of Way Topographic Surveys/Aerial Mapping Control Construction Staking ALTA/ACSM Land Title Surveys Easement Mapping and Descriptions Parcel/Utility Mapping Floodplain Surveys/ FEMA Elevation Certificates Geographic Information Systems (GIS) Water & Environmental Resources Floodplain Analysis Lake Rehabilitation & Management Stormwater & Water Quality Management Environmental Assessments Regulatory Compliance & Permitting Wetland Management Agricultural Engineering Animal Waste Management Facilities Regulatory Permits Water Runoff and Drainage Facilities Construction Observation and Administration Building Inspection Uniform Dwelling Code Enforcement Commercial Building Code Enforcement Property Maintenance Inspection
|
|
|||||
The Ho-Chunk Nation expanded their Casino operations in Lake Delton, Wisconsin. The project involved expansion of the existing casino and construction of a new motel and convention center. In conjunction with this project, substantial site infrastructure improvements were made to serve the development. These include: access roads and parking lots; storm water facilities and detention basins; water tower, two water supply wells and water main; wastewater treatment facility, lift station and sewer main; and roadway improvements. Vierbicher provided the following services for the Ho-Chunk Lake Delton Casino.
|
||||||